翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Chengyu Railway : ウィキペディア英語版
Chengdu–Chongqing Railway
Chengdu–Chongqing Railway or Chengyu Railway (), is a single-track, electrified, railroad in the Sichuan Basin of Southwest China between the cities Chengdu and Chongqing. Chongqing's short form name is Yu (渝) and the railway is named after the two cities. The line has a total length of .〔
The Chengyu Railway opened in 1952 and was the first railway to be built after the founding of the People's Republic of China. Other cities along the route include Jianyang, Ziyang, Zizhong, Neijiang, Longchang and Yongchuan.
==History==

In 1903, a railway line between Chengdu and Chongqing, the two biggest cities in Sichuan, was proposed by Huguang Viceroy Zhang Zhidong as part of a railway from Sichuan to Wuhan. Construction on this line began in 1909 and halted in 1911. Attempts to resume construction in 1936 and 1947 ended with the outbreak of the Sino-Japanese War and the Chinese Civil War. On December 31, 1949, shortly after the Chinese Communists captured Sichuan from the Nationalists, Secretary of the Southwest Bureau Deng Xiaoping proposed the building of the railway. Work began on June 15, 1950 and involved 30,000 People's Liberation Army troops and 10,000 civilian laborers.〔 More than 400 private steel mills in Chongqing supplied steel for the line.〔(Chinese)("成渝铁路:中国铁路史的奇迹" ) 2009-09-11〕 The line was completed on June 13, 1952, and entered into trial operation on July 1. It was the first railway line built in China after the establishment of the People's Republic of China.〔
In 1987, the Chengyu Line was fully electrified, raising annual carrying capacity from 6.1 million tons to 13 million. By 2008, the line was transporting 90 million tons of cargo and 70 million passengers per year.〔("新中国档案:成渝铁路--新中国的第一条铁路" ) 2009-08-11〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Chengdu–Chongqing Railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.